Task 5 — Bug Fixes, UI Restructuring & Feature Additions Progress

Status Overview

  • Start Date: 2025-05-19
  • Current Phase: PRIORITY 3 (UI/UX Restructuring)
  • Overall Progress: 42% complete (8/19 tasks done)

PRIORITY 0 — Crashes (Fix First, Parallel) COMPLETED

Task Status Notes
SpellsTab crash diagnosis/fix Completed Fixed unprotected ENCHANTMENT_EFFECTS access
LabTab crash diagnosis/fix Completed Added safe access to store.elements
DebugTab crash diagnosis/fix Completed Moved Toaster/GameToaster inside DebugProvider

PRIORITY 1 — Mana Conversion Mechanic Fix COMPLETED

Task Status Notes
Wire conversion drain to effectiveRegen Completed Removed redundant rawMana -= actualConversion

PRIORITY 2 — Spire Mode Fixes

Task Status Notes
2a. Floor Rendering & Identity Pending Context gathering next
2b. Swarm Floors Completed Verified by check sub-agent
2c. HP Bar Live Updates Completed floorHP synced to enemy HP
2d. Casting Progress Overflow Pending Context gathering next
2e. Climb/Descend Controls Pending Context gathering next
2f. Activity Log Implementation Pending Context gathering next
2g. Spell Info Display Fix Pending Context gathering next

PRIORITY 3 — UI/UX Restructuring

Task Status Notes
3a. CraftingTab Restructure Completed Removed stepper, added Fabricate/Enchant tabs
3b. LootTab Nesting Fix Completed Removed redundant LootTab wrapper
3c. AchievementsTab Nesting Fix In Progress Context gathering → execution

PRIORITY 4 — Enchantment Effects & Research

Task Status Notes
4a. Mana-Type Capacity Enchantment Effects Pending Context gathering next
4b. Mana Capacity Research Visibility Gate Pending Context gathering next
4c. Skill Requirement Display Bug Fix Pending Context gathering next
4d. Enchantment Power Effect Implementation Pending Partially done

PRIORITY 5 — Insight Upgrade Analysis

Task Status Notes
5a. Create design proposal Pending Context gathering next

Workflow Log

  • PRIORITY 0 crashes fixed via parallel sub-agents
  • PRIORITY 1 mana conversion fix applied
  • PRIORITY 2b, 2c verified completed
  • Task 12 (CraftingTab) completed
  • Task 13 (LootTab) completed
  • Current: Task 14 (AchievementsTab) context gathering